Timelines
DPP Deadlines by Sector
All enforcement dates for the EU Digital Product Passport across product categories, from the 2027 battery mandate to the 2030+ extended rollout. Updated to reflect current ESPR delegated act progress.
Phase 1Now–Feb 2027
Batteries (mandatory, primary legislation)
Act immediately — no grace period after Feb 2027.
Phase 22027–2030
Textiles, Electronics, Iron & Steel, Furniture, Tyres, Appliances
Begin data mapping now. Delegated acts imminent.
Phase 32030+
Paints, Chemicals, Construction, Semiconductors, Mattresses
Monitor consultation progress. Begin readiness planning.
Urgency:CriticalHighMediumPlanned
Product SectorDeadlinePhaseStatusKey DPP Focus Areas
Batteries (Industrial & EV)
First mandatory DPP. Includes EV, industrial ≥2 kWh, LMT batteries.
Textiles & Apparel
Covers garments, accessories, footwear. Fibre composition and repair index required.
Electronics & ICT
Smartphones, laptops, tablets. Repairability score and spare parts data.
Furniture
Material sourcing, durability, reparability, recyclability, chemical content.
Tyres
Rolling resistance class, wet grip, noise, recycled content.
Iron & Steel
Recycled content, production emissions, chemical composition, country of origin.
Home Appliances
Energy efficiency class, spare parts availability, end-of-life handling.
Packaging
DPP required when contained product requires one. Recyclability data.
Detergents & Surfactants
Ingredient transparency, biodegradability data, packaging recyclability.
Mattresses
Material composition, flame retardants, recyclability, take-back scheme.
Paints & Coatings
VOC content, hazardous substances, recyclability of packaging.
Chemicals
SVHC declarations, SCIP database alignment, safety data sheet linkage.
Construction Products
Carbon footprint, recycled content, recyclability at end-of-life.
Semiconductors
Supply chain origin, critical minerals content, recycled material.
Note: Dates for Phase 2 and Phase 3 sectors are based on current Commission consultation progress and may shift by 6–12 months when delegated acts are formally published. The battery deadline (February 2027) is fixed in primary legislation.
All Guides